• Installation for piping work to boiler
  • Installation for piping work to incinerator
  • Installation of transition joint for MDPE underground pipe for terrace housing
  • Installation of warning tape prior to backfilling for underground pipe to commercial building
  • Back filling with fine sand for MDPE underground pipe for housing developement
  • Installation LPG piping for industrial liquid system
  • On / Off labeling gor gas equipment
  • Installation of internal regulating system for commercial
  • Piping work for food court / premises run at low level under gas equipment c/w yellow painting, pipe support, arrow signage and final termination valve prior equipment
  • Pipe dropper for high and low pressure line c/w pipe support, painting and arrow signage. Vent pipe connected from second stage regulator and discharge to open air
  • Installation of Vaporizer of Liquid System of LPG at gas store
  • Main line for shopping complex run at high level c/w yellow painting, pipe support and arrow signage